Site conduct and safety
Our forward-deployed engineers work in your plant, your warehouse and your front office, under your rules. This page covers the safety orientation, protective equipment, escorted areas, staying out of the way of production, photos and recordings, and confidentiality.
Before entering the floor
Section titled “Before entering the floor”No engineer walks onto your floor before completing your safety orientation. That applies on the first morning of the Discovery Sprint and to any engineer who joins later.
- Before day one we ask your safety contact for three things: the orientation you give contractors, the protective equipment each area requires and the areas that need an escort.
- On the first morning the engineers sign in the way your contractors do and take the orientation.
- Only then do they walk the floor, with a guide from your side.
They learn what any contractor learns: where the pedestrian walkways are, how forklift traffic runs, where the exits and the assembly point are, and who to tell when something looks wrong.
If your contractors must meet other requirements before they come on site, such as an insurance certificate or a background check, tell us when the Discovery Sprint is being scheduled. That way they are settled before day one.
Protective equipment
Section titled “Protective equipment”Our engineers wear what each area requires for as long as they are in it, including on a two-minute walk to the scheduling board. Send the list ahead: safety glasses, safety shoes, hearing protection, a high-visibility vest, a hard hat or whatever else your site specifies. Tell us what you issue to visitors, and our engineers bring the rest.
Escorted areas
Section titled “Escorted areas”Tell us before day one which areas are closed to visitors or need an escort, such as an area with customer-owned tooling, a lab, chemical storage or the server room. Our engineers enter those areas only with the escort you assign, or not at all. In the warehouse they stay in the marked walkways and give way to forklifts.
Never in the way of production
Section titled “Never in the way of production”Our engineers watch physical work to understand the digital work around it. They do not do it, and they do not slow it down.
- They do not touch machines, controls, material or product, and they do not operate equipment or vehicles.
- They do not ask an operator to stop, slow down or repeat a job. Questions wait for a break or go to the supervisor.
- The same rule holds in the office. When the phones are busy at the order desk, the engineer listens and asks afterward.
- If your people tell an engineer to stop or to leave an area, the engineer does so at once.
- If an engineer sees something that looks unsafe, they tell the area supervisor at once.
Photos and recordings
Section titled “Photos and recordings”Our engineers take no photo, video, audio recording or screen recording without permission. Before day one we ask who gives that permission and where it applies.
A photo of the scheduling board, a paper traveler or a whiteboard makes the Operations Map more accurate, so we do ask. Once permission is given, these rules still apply:
- In any area you mark as restricted, they ask each time.
- They do not photograph people without their consent.
- They do not photograph customer drawings, labels or product unless you have cleared it.
- A photo of a screen that shows customer or supplier data is treated as your data.
Photos and recordings are kept with the working files for your engagement and deleted with them at exit.
Confidentiality
Section titled “Confidentiality”Confidentiality terms are part of the contract, which is signed before the first day on site. Our engineers will see your customer list, your prices, your supplier terms and the way the work is really done, workarounds included. They use what they see for your engagement and for nothing else.
Two more rules apply:
- We do not use your company’s name, your logo or anything measured at your site in public without your permission.
- What a person says while being shadowed is used to describe the work. The Operations Map describes steps and roles. It does not rate individuals.
If a rule is broken
Section titled “If a rule is broken”Your site rules come first, and they apply to our engineers the way they apply to any contractor. If an engineer breaks one, stop them on the spot and tell us.